Brightspot CMS User Guide

Merging edits into scheduled assets


You can merge edits into to a scheduled asset, combining its existing content with your edits. This is useful if you only want to add a few sentences or images, but want the content to remain largely the same.

Note
In order to merge edits into a scheduled asset, its schedule must have a defined trigger date.

To merge edits into scheduled assets:

  1. Search for and open the asset on the content edit page. If the asset is scheduled, Brightspot displays scheduling options.
    Scheduling options.png
  2. Click the selection field next to visibility.
    Scheduling selection field.png
  3. Select Merge.
  4. Click Schedule. Any edits you make to this scheduled asset are merged into the scheduled asset.
Previous Topic
Publishing an asset with multiple schedules
Next Topic
Replacing content in scheduled assets
Was this topic helpful?
Thanks for your feedback.
The elements that get you up and running in a matter of days, from pre-built content types, to modules, to landing pages.

Content types
Modules
Landing pages
Everything you need to manage and administer content within Brightspot CMS, including plug-and-play integrations.

Dashboards
Publishing
Workflows
Admin configurations
A guide for installing, supporting and administering code on the Brightspot platform, including integrations requiring developer support to use.

Field types
Content modeling
Rich-text elements
Images