Brightspot CMS User Guide

Replacing content in scheduled assets


You can replace content within a scheduled asset, thereby overwriting its existing content without having to re-schedule the asset.

Note
In order to replace content within a scheduled asset, its schedule must have a defined trigger date.

To replace content in scheduled assets:

  1. Search for and open the asset on the content edit page. If the asset is scheduled, Brightspot displays scheduling options.
    Scheduling options.png
  2. Click the selection field next to visibility.
    Scheduling selection field.png
  3. Select Replace.
  4. Click Schedule. Any edits you make to this scheduled asset replace the existing content within the scheduled asset.
Previous Topic
Merging edits into scheduled assets
Next Topic
Bulk scheduling
Was this topic helpful?
Thanks for your feedback.
The elements that get you up and running in a matter of days, from pre-built content types, to modules, to landing pages.

Content types
Modules
Landing pages
Everything you need to manage and administer content within Brightspot CMS, including plug-and-play integrations.

Dashboards
Publishing
Workflows
Admin configurations
A guide for installing, supporting and administering code on the Brightspot platform, including integrations requiring developer support to use.

Field types
Content modeling
Rich-text elements
Images